Construction Management & Asset Monitoring
Construction Management & Asset Monitoring
Architecture, engineering, and construction companies save time and money monitoring project progress while fortifying their QA/QC process with the high-fidelity digital twin platform.
Reduce alterations, modifications and re-drawing with immersive 3D models
50% reduction in cost and time to capture as-built conditions using Matterport
90% of AEC professionals agree that reality capture is the future of AEC
82% agree that a 3D walkthrough is superior to alternatives to communicate site conditions
Stay on track with digital twins.
Create a record of your as-built progress by capturing existing conditions
Leverage the Matterport BIM file capabilities for easy LOD 200 BIM creation (.RVT/.IFC)
Compare the as-built environment to the design intent models with high density point cloud exports (.E57)
View existing conditions and illuminate in unmatched clarity as-built defects before they impact the project schedule.
Perform remote inspections
Reduce risk and increase efficiency by tagging and documenting issues before they become costly, even when you're not on the job site.
Handover the project as a virtual walkthrough
Use Matterport to capture the final stage of the building, overlaying critical closeout documentation for easy access on an interactive, cloud-based digital twin.
Construction Site Progress And MonitoringÂ
The purpose of construction site progress and monitoring is to ensure that the project is completed on time, within budget, and to the required quality standards. By tracking progress and monitoring the work being done, project managers can identify potential issues and take corrective action before they become major problems.
Site inspections: Regular internal modelling of the construction site can help identify issues such as safety hazards, quality issues, and construction defects.
Progress meetings: Regular virtual meetings with the project team can help ensure that everyone is aware of the project status and any issues that need to be addressed. This can save valuable and costly travel time and site based meetings.
Schedule tracking: Tracking the project schedule can help identify any delays or potential delays in the project timeline.
Project Documentation: Tags within a 3D Virtual Tour can be linked to cloud files with all the latest contract documentation from drawings, schedules, M&E info, H&S files, progress images and even requests for information etc.
Overall, construction site progress and monitoring is essential for ensuring that a construction project is completed successfully, safely, on time, and within budget.